Tomorrow’s Tech Treepowered by Astra

Energy · Projected milestone

Sustained industrial-scale geologic hydrogen extraction

Estimated year~2033

60% by 2042 · including earlier years

The year is an editorial timing estimate. The percentage applies to occurrence by the stated deadline. These estimates are not calibrated odds.

One natural-hydrogen field delivers at least 1000 tonnes of separated hydrogen during twelve consecutive months, with independently published flow, purity, extraction-energy and leakage measurements.

Explore this milestone on the interactive map

What the forecast means

Milestone stage: field demonstration

resource assessment active; qualifying sustained output not established

Timing window: 2028–2042. An editorial range, not a statistical confidence interval.

Completion criteria: One natural-hydrogen field delivers at least 1000 tonnes of separated hydrogen during twelve consecutive months, with independently published flow, purity, extraction-energy and leakage measurements. Resolve only from inspectable evidence meeting every stated criterion; a plan or extrapolation does not resolve it.

This page describes a forecast, rather than an achieved result. Read the methodology and assumptions.

Built on

Led to

Sources & evidence

Astra editorial synthesis; cited researchers retain credit for their results

Record reviewed 2026-10-18